The project is carried out in cooperation with Kemeko BH as the project leader and holder of permits that include decontamination technologies owned by Dekonta. The start of the project is October 2019 and it is still ongoing.
The activities of the consortium relate to the treatment of contaminated soil, which was delivered from the locations where gas stations are being reconstructed. The treatment is carried out by bioremediation at the location of the Bioremediation Center, Kemeko BH Lukavac.