Client: REDS group (EBRD)
Location: BiH
Time period: July 2021 – June 2022
About:
The Phase II investigation of the EVP Doboj km 84+980/43 TR1 Doboj Substation includes the following activities:
- Production of Sampling Plan: Develop a detailed plan for sampling activities.
- Drilling to Groundwater Level: Conduct drilling operations to reach the groundwater level.
- Soil and Groundwater Sampling: Collect samples of soil and groundwater at the site.
- Soil and Groundwater Analysis: Perform comprehensive laboratory analyses of the collected soil and groundwater samples.
- Production of Risk Assessment: Conduct a risk assessment based on the analysis results.
- Final Result Interpretation: Interpret the results and provide a final report on the findings.
- These activities aim to thoroughly investigate the environmental conditions at the Doboj Substation site, assess potential risks, and ensure compliance with environmental regulations.